[caption id="attachment_26588" align="alignnone" width="768"]
Water Street Mixed-Use Development – The City of Naperville agreed to take ownership of the parking structure following completion of construction, and WGI represented the City’s interests during design and construction. (Photo taken by Marian Kraus Photography)[/caption]
Where the owner relinquishes some level of design and construction authority, but maintains full long-term maintenance and operations responsibilities, WGI recommends retaining a third party to represent the owner’s interests, and to confirm that the design appropriately considers function (entry/exit and access/revenue control, technology, vehicular/pedestrian circulation, and parking layout), user comfort and safety, wayfinding, structural system impact on performance, mechanical/electrical systems, operations, and long-term performance with respect to maintenance, future repairs, and service life.
[caption id="attachment_26589" align="alignnone" width="1000"]
Louisville Arena – WGI provided third-party parking consulting services, assisting the owner in making important planning, design, and construction decisions.[/caption]
Ideally, third-party parking design expertise is introduced during the planning phase, with the development of bridging, or basis-of-design documents that set minimum standards for the parking structure design and construction. However, owner’s representation services can be engaged at any point during the project’s planning, design, or even construction phase. As the owner’s representative, WGI will represent the owner’s interests, providing design review and oversight, construction administration review, and general assistance related to achieving a functionally efficient and durable parking structure. Important considerations include: