BOYNTON BEACH REGIONAL FORCE MAIN AND LIFT STATION | WGI

Toll Free

866.909.2220

BOYNTON BEACH REGIONAL FORCE MAIN AND LIFT STATION

Boynton Beach, FL

Survey, modeling, design, permitting, bid assistance, and construction administration services were completed for this new regional wastewater force main and lift station. The station is critical to the City, as it serves nearly a third of its population, intercepts flow, and alleviates excess capacity on an existing regional lift station. In addition, the new force main provides an alternate to the existing force main. Several jack-and-bore and directional-bore crossings under Interstate 95, the CSX and FEC Railroads, and several major drainage canals were also included in this project.