I-75 EXPRESS LANES SEGMENT C | WGI

Toll Free

866.909.2220

I-75 EXPRESS LANES SEGMENT C

Broward County, FL

The I-75 Express Lanes Segment C improvements require design and construction within an existing median, and a barrier wall divided four-lane tolled roadway; each direction will have two travel lanes with paved inside and outside shoulders. In addition, the WGI Design-Build Team will construct the Pembroke Road Overpass Bridge to replace I-75 bridges at the C-4 with a culvert, and reconstruct the Miramar Parkway Interchange, including the Miramar Parkway Bridge over I-75.