I-75 WIDENING FROM SOUTH OF SR 50 TO HERNANDO/SUMTER COUNTY LINE | WGI

Toll Free

866.909.2220

I-75 WIDENING FROM SOUTH OF SR 50 TO HERNANDO/SUMTER COUNTY LINE

Hernando County, FL

This Design-Build project consisted of widening and reconstructing approximately six miles of I-75 in Hernando County, including reconstruction of the interchange at US 98/SR 50/Cortez Boulevard to a single-point urban interchange configuration, replacement of the I-75 bridges over US 98 with single-span steel bridges designed to accommodate the future widening, and widening and reconstructing approximately one mile of US 98 within the interchange limits using concrete pavement.

Subsurface utility locating requirements included providing necessary locates to clear the new high-mast lighting, signalization, and bridge widening at both Croom Rital Road and the Withlacoochee River.