PLANTATION OAKS BOULEVARD EMERGENCY CULVERT REPLACEMENT

Clay County, FL

This Design-Build was an emergency project to replace a triple box culvert under Plantation Oaks Boulevard over the North Fork of Double Branch. The existing culvert’s severe reinforcing failure required the roadway and sidewalk to be closed for safety, causing a significant detour and inconvenience to the community.

The design, permitting, and construction were completed 15 days ahead of the FDOT-required 60-day timeframe. Services included survey, roadway, drainage, structural, signing and marking, temporary traffic control, lighting, utility coordination, water main, permitting, and post design services.

This project received the Merit Award in the Transportation-Structure category for the Design-Build Awards from the DBIA Florida Region.