Wekiva Parkway (SR 429), Segment 6 | WGI

Toll Free

866.909.2220

Wekiva Parkway (SR 429), Segment 6

Lake and Seminole Counties, FL

WGI is currently delivering this environmentally-challenging design-build project which will create six miles of limited-access toll road and a non-tolled service road for local travels, a tolled four-lane elevated expressway, and three new segmental bridges over the Wekiva River (a designated wild and scenic river). It also includes two ramps, a roundabout, 23,000 feet of wildlife bridges, two pairs of 3,900-foot-long bridges, and a 12-foot-wide multi-use trail. WGI developed 3D-engineered models to facilitate construction. Our build partner is using data from the models to enhance equipment operation. The project is underway and on schedule.