Water Resources Archives | WGI

Toll Free

866.909.2220

BASIN DRIVE STORMWATER PUMP STATION REHABILITATION

< Previous ProjectNext Project >BASIN DRIVE STORMWATER PUMP STATION REHABILITATIONDelray Beach, FLThe Basin Drive coastal residential area suffers from periodic inundation caused by undersized stormwater management systems and rising sea levels, especially during king...

E-3 CANAL BANK STABILIZATION

< Previous ProjectNext Project >E-3 CANAL BANK STABILIZATIONPort St. Lucie, FLThe E-3 Canal banks were failing and needed to be stabilized to prevent further loss and damage, prompting the City to ask for a professional engineering design. Design Phase I included...

EPB-3 CANAL/HOOD ROAD BOX CULVERT CROSSING

< Previous ProjectNext Project >EPB-3 CANAL/HOOD ROAD BOX CULVERT CROSSINGPalm Beach Gardens, FLResponsibilities for this project included the design, permitting, and construction observation of a concrete box culvert associated with the widening of Hood Road....

NATURAL RESOURCE CONSERVATION SERVICE CANAL RESTORATION

< Previous ProjectNext Project >NATURAL RESOURCE CONSERVATION SERVICE CANAL RESTORATIONFort Pierce, FLPast flooding from tropical storms prompted the City to request a design and construction engineering inspection for three major stormwater projects, with funding for...

I-95/CSX OPEN CHANNEL CONVEYANCE ARMORING

< Previous ProjectNext Project >I-95/CSX OPEN CHANNEL CONVEYANCE ARMORINGBroward County, FLThis project consisted of analysis and design to convert an existing grassed ditch to an articulating concrete block-lined facility. The existing grassed ditch was subject to...