In our latest webinar, Built to Survive vs. Built to Last, WGI's Director of Structural Engineering, Robby Vogel, PE, SE, explored the gap between building code compliance and operational continuity and the design decisions that determine whether a facility merely survives a major wind event or actually performs after one.
As hurricanes reach further inland and the tornado corridor shifts eastward, facilities across Florida, Texas, and the Carolinas face compounding wind hazards over a single building's life. At the same time, the building code, by design, was never written to keep a 911 center or emergency operations center running the week after a storm. That gap between life safety and operational continuity is where storm recovery is decided, and it is determined long before the clouds arrive.
WGI's integrated engineering approach brings structural, MEP, civil, and architectural disciplines together early in the design process to address exactly this challenge. The decisions that govern how a facility responds to extreme wind loading like load path continuity, envelope performance, backup power, communications redundancy, and site access, are most efficiently made during initial design. When they are deferred, they return later as retrofit projects at significantly higher cost, or not at all.
Whether you're a facility owner, capital planner, county engineer, or public-sector leader responsible for infrastructure in hurricane or tornado country, understanding the difference between compliance and continuity is essential to protecting the functions your community depends on when conditions are at their worst.
If you missed our live session or want to revisit the discussion, click below to watch the full webinar recording and explore our companion whitepaper for deeper insights into the engineering framework behind storm-ready facility design.
[embed]https://youtu.be/eSsNhfXM6zc?si=P7xV_N7e4S1r1qq4[/embed]Download our whitepaper, "Built to Survive vs. Built to Last," for the complete framework WGI uses to translate "must remain operational" into design decisions across structural, MEP, civil, and architecture, including passive vs. active strategy sequencing, facility case studies, and total cost of ownership math.
If your organization owns, operates, or designs facilities that cannot afford to go dark when conditions are at their worst, WGI's integrated engineering teams can help you define what your facilities need to do and align design decisions accordingly.
Connect with our team today to learn how WGI can help your organization close the gap between compliance and continuity.