WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Buildings 25-33-52 Hurricane Hardening City of Boca Raton

Client:
City of Boca Raton
Market:
Water & Environment, Water & Wastewater Utility
Location:
Boca Raton, FL

Project Details

WGI provided an assessment to determine the hurricane resiliency for Buildings 25, 33, and 52 at the Boca Raton Water Treatment Plant. The assessment was followed by the preparation of construction documents for the Hurricane Hardening of these three buildings. Building 25 is a 1-story building housing the effluent pump station. Building 33 is a 2-story electrical building that requires a man-lift to close the second-floor shutters. Building 52 is a 1-story digester building.

WGI conducted a site condition assessment at each of the three buildings and provided a report of findings and recommendations for repairs and upgrades or replacements at each building. Plans for each building were prepared, identifying areas that needed remedial repairs, replacements, and upgrades. The plans included repair procedures and details for each type of work. A final quantities estimate and estimate of the probable construction cost was provided.

WGI assisted the City with bidding, attended pre-bid meetings, and responded to contractor RFI’s during the bidding process.

During the construction phase, WGI attended a pre-construction meeting, conducted shop drawing reviews, attended monthly meetings, conducted special inspections that included formwork embedments and reinforcing, concrete casting, placing precast panels and bolted/welded components, anchorage to existing building floor and structural roof members, wall to wall interconnections, metal deck attachment, window replacement, door replacements, louver replacements, window, and door testing. Upon construction completion, WGI conducted a substantial and final completion inspection and provided a Certificate of Construction Completion to the owner.

Project at a Glance

  • Buildings 25-33-52 Hurricane Hardening City of Boca Raton — image 1
  • Buildings 25-33-52 Hurricane Hardening City of Boca Raton — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.