WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

City of Tamarac Water Treatment Plant Administrative Building

Client:
CPZ Architects, Inc,
Location:
Tamarac, FL

Project Details

The City of Tamarac Water Treatment Plant Administrative Building design consisted of the design, permitting, bidding assistance, and construction administration services for a new administrative building. Structural, MEP, civil, and landscape architecture were provided for the project. The project consists of design and construction of a new Administration and Motor Control Center (MCC) Buildings, transfer of plant controls from the existing administration building to the new administration building, and MCC building, demolition of the existing administration building, and design of a Master Site Storm Water Management System Plan and implementation of the first phase of the Storm Water Master Plan.

The new Administration and MCC buildings were designed as a Risk Category 4 hardened structure. This essential facility included ground floor elevation two (2) feet above the base floor elevation in accordance with ASCE 24 for Flood Resistant Design and Construction. The MEP design included specific design systems to support areas of need, such as the lab, chromatography, and bacterial spaces.

The structural site improvements anticipated consist of a covered walkway connecting the Administration and MCC buildings; An elevated pedestrian bridgeway connecting the Administration building to the above-ground sand filter access catwalks. Additionally, structural design and construction of civil site improvements consisting of water control structures, cured in place pipe replacement/ Insitu pipe replacement retaining walls, site walls, and utility bins are anticipated.

Site stormwater improvements will consist of the development of a master plan for the Tamarac Water Treatment Plant Site. The master plan will consist of the design of an overall stormwater system with accommodations for future plant improvements.

Project at a Glance

  • City of Tamarac Water Treatment Plant Administrative Building — image 1
  • City of Tamarac Water Treatment Plant Administrative Building — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.