WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

District 3 Pedestrian Mobility Projects - Boxwood Mid-Block Crossing

Client:
City of San Antonio
Market:
Cities and Communities, Civic
Location:
San Antonio, Texas

Project Details

WGI performed the S WW White Rd & Boxwood Rd Pedestrian Safety Study to address growing safety concerns at a busy intersection in a residential and transit-dependent area. The intersection, located just east of downtown, sees consistent vehicle traffic and regular pedestrian crossings, despite lacking marked crosswalks or traffic control devices. With two VIA bus stops positioned on opposite sides of S WW White Road and no nearby crosswalk, many pedestrians cross mid-block, often waiting in travel lanes for traffic to clear.

To evaluate conditions, the project team conducted field observations, traffic counts, and a crash analysis capturing 6+ years. Overall crash data pointed to patterns of distracted driving and failure to yield highlighting safety concerns beyond just pedestrian volumes. Observations confirmed that people were crossing unsafely out of necessity, especially given the lack of accessible infrastructure.

The study determined that while pedestrian volumes did not meet the threshold for a Pedestrian Hybrid Beacon, the area still warranted improvements. Recommendations include installing Rectangular Rapid Flashing Beacons (RRFB) and a pedestrian refuge island at the mid-block location south of Boxwood Road. These upgrades aim to create a safer, more predictable crossing for pedestrians without significantly disrupting traffic flow. The project reflects the city’s continued focus on improving mobility and reducing conflict points between vehicles and pedestrians in high-risk corridors.

Since WW White Road falls within TxDOT right-of-way, close coordination with TxDOT was required from the outset of the project. WGI provided full design services, including the layout of the overhead RRFB, ADA-compliant pedestrian connectivity, and limited drainage improvements, all developed with funding constraints in mind. The design process also included utility coordination and engagement with VIA. Given the limited right-of-way and proximity to existing bus stops, pole placement required variances that were proactively coordinated with utility agencies and the construction contractor to avoid field delays and cost overruns. To further reduce construction challenges, plans were shared with the contractor for review during design. WGI worked closely with the City to meet a compressed project schedule, combining design phases and expediting deliverables to align with funding deadlines.

Project Highlights:

  • Crash behavior analysis
  • ADA and drainage improvements
  • Proactive interagency coordination
  • Streamlined design schedule to meet tight funding deadlines
  • Resolved ROW and pole placement challenges during design phase
  • Cost estimates

Project Cost $230,000.00