WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Henry Ford Hospital GSPS Parking Garage

Client:
Henry Ford Hospital
Market:
Parking
Location:
Detroit, MI

Project Details

Henry Ford Hospital is a large urban medical center in downtown Detroit. The GSPS/Staff Parking Structures are adjacent facilities and provide separate parking for visitors and staff. The structures were built in the early 1960s, utilizing conventionally reinforced, cast-in-place concrete, short-span construction. The structures contain over 650,000 square feet of parking area, providing parking for approximately 2,000 vehicles. Due to years of exposure to the Midwest climate, the structures exhibited significant corrosion deterioration and significant water leaking into the occupied kitchen/patient areas below. 

WGI completed a structural evaluation and repair-options analysis summarizing various repair and protection options available. Repair options included conventional patching, strip patching, bonded concrete overlay, structural steel reinforcement, and slab replacement. Protection options included sealers, traffic-bearing membranes, protected membranes, and cathodic protection. Options analysis included a life-cycle cost analysis presentation to compare various options on a present-worth basis. 

WGI completed construction documents, assisted with contractor bidding, and provided construction administration services, including on-site observation. Repairs to the facilities were completed while maintaining all hospital operations and maintaining a minimum of 75% of the parking throughout the repairs. 

Project at a Glance

  • Henry Ford Hospital GSPS Parking Garage — image 1
  • Henry Ford Hospital GSPS Parking Garage — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.