WGI was selected by the owner of the commercial tower, parking structure, and plaza area to ensure the proposed waterproofing replacement project developed by the adjacent hotel meets the standard of care needed to protect their interest and property.
WGI provided consulting services, inclusive of design document reviews, product selection reviews, warranty durations, and installation processes. WGI was actively involved from the removal of the existing plaza system to the completion of the new plaza system. The new system, complete with a 20-year warranty, consists of a hot-applied rubberized layer with a fabric reinforcing layer, followed by a protection board and specially designed mat to facilitate proper drainage. WGI performed regular site visits during the construction process and provided onsite detailing instructions to the contractors’ teams.
The transformation of the plaza was then finished with the installation of all-new landscaping for a final product in the form of a first-class plaza.
Project Highlights
- Evaluated construction documents for the new plaza system
- Performed regular site visits to provide instructions & recommendations
- Plaza system replacement was highly successful
- Parking Deck Structural Repairs