Project Details
Project Cost $4,200,003.00
Contact Our Team About Your Next Project.
At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.
































WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.
You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.
Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.
Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.
Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.
Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.
Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.
Our passionate design professionals frequently share their expertise at webinars and virtual events.
As part of WGI’s continuing Environmental Consulting contract, Martin County hired WGI to provide feasibility design services for a water quality project within the Hog and Mapp Creek watersheds. Both watersheds have been identified by South Florida Water Management District as contributors of high concentrations of total nitrogen (TN), total phosphorus (TP), and copper into the St. Lucie River.
The initial focus of the study was to understand if Hog Creek could be diverted north towards Mapp Creek and a county-owned preserve area into a proposed combined stormwater treatment area (STA). Due to gradient limitations, the modeling performed showed that it would not be possible to locate the STA on county-owned land without active pumping. Alternative designs were prepared to identify the required size and preferred location for a combined STA for the county’s future interest.
Finally, WGI developed 30% design plans for a restoration of the Mapp Creek ditch within county-owned lands. The restoration plan proposes to approximately double the width of the ditch right-of-way to allow for the installation of planted littoral shelves along the banks of a sinusoidal center channel for an approximately one-mile length. The restoration will integrate bio-sorption-activated material (BAM) into the littoral shelves within the last 100 feet before a weir structure.
The 12-acre hybrid biological/chemical treatment will provide an effective and efficient treatment train for the 3,653-acre Mapp Creek watershed. The required Total Maximum Daily Loads (TMDLs) identified for the Mapp Creek watershed requires a 47.1% reduction in TN and a 61.8% reduction in TP. The proposed project is modeled to provide a load reduction of 70% for TN and 85% for TP.
Project Cost $4,200,003.00
At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.
ST. LUCIE COUNTY
ILLINOIS RIVER
MARTIN COUNTY