WGI performed an evaluation of the parking structure to identify deterioration and damage to the concrete structure and waterproofing systems. The parking structure exhibited delaminations at various structural components: slabs, beams, columns, curbs, and walls. Joint sealants and expansion joints throughout the structure exhibited signs of distress.
WGI provided evaluation and construction documents on a very tight schedule.
Project Highlights
- Full slab replacement
- Column, beam, curb, and wall repair
- New joint sealants
- New expansion joints
- Deck coating
- New lighting
- New traffic equipment