WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Memorial Hospital Parking Structure

Client:
Memorial Hospital
Market:
Parking
Location:
Colorado Springs, Colorado

Project Details

The seven-story, four-bay wide parking structure was built on the landlocked urban site of Memorial Hospital to meet the need for 1,500 additional parking spaces for patients, visitors, and staff. The hospital board and neighborhood groups sought a parking structure that did not look like the stereotypical horizontal parking structure. The design provides a “vertical feel,” featuring a two-story colonnade that accommodates ambulances and over-the-road trucks.

Project Highlights:

• Precast concrete superstructure
• Double-tee decks are field-topped with 5,000-psi concrete. Braced frames with steel diagonals provide lateral support in one direction while concrete shear walls are used in the other direction
• De-watering the site was necessary because the below grade structure extended into the water table
• Entry/exit ramps and the top-level concrete slab contain a glycol de-icing system
• Interior is painted white to enhance brightness and safety
• Brick inserts in precast panels relate to existing building materials used throughout the campus

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise