WGI was responsible for the design and permitting of infrastructure improvements in the Pearl City and Lincoln Court neighborhoods. Pearl City is a historic district within the City of Boca Raton. The project included roadway, drainage, utility, street lighting and landscape improvements to approximately two miles of residential and urban roadways. The scope of services included public outreach with the affected neighborhoods and adjustments to adjoining properties. Coordination and planning was provided by a “Blue Ribbon Committee” appointed by the City Commission of Boca Raton to ensure community involvement.
The project required permitting by SFWMD, Palm Beach County and the FDOT. WGI prepared a Subsurface Water Management Report and conceptual and final design documents. Prior to this project being constructed, the neighborhood had no drainage infrastructure in place.
The project also required coordination with FPL, BellSouth and Adelphia Cable.