WGI served as an Electrical Engineering Consultant for the addition of electrical infrastructure to the Savio Athletic Fields associated with St. Dominic Catholic High School. The project scope included providing power to new batting cages and on-site lighting. The project scope also included a study into the ultimate future condition of the fields to anticipate the electrical requirements. The output of that study informed the number of conduits and routing throughout the site for future provisions. WGI coordinated with the serving utility for a new meter and panel and coordinated potential future power needs.