WGI was selected by the City of Boynton Beach to design and oversee construction of a substantial infrastructure improvement project. The neighborhood improvements included 60,000 linear feet of water main replacement, moving rear yard services and meters to front yards, 5,000 linear feet of stormwater system upgrades, pavement reconstruction and overlay, roadside swales, driveway aprons, and sidewalks over a 50 block residential neighborhood covering 252 acres. A critical sanitary sewer force main connection was also designed and installed to connect the City’s sanitary sewer system across the FEC Railroad and Intracoastal Waterway to the barrier island. Installation of the 6-inch to 10-inch diameter water and force main utilized a combination of open cut, horizontal directional drill, jack and bore, and pipe bursting construction methods.
Additional services provided by WGI included survey, subsurface utility engineering, landscape architecture, environmental permitting, and public outreach activities. WGI planners created outreach brochures, hosted neighborhood meetings, managed a website, and monitored a trilingual hotline to answer the questions and concerns of residents and ensure an effective process.
Project Highlights:
-
Total Length: 60,000 linear-feet (water main); 5,000 linear-feet (stormwater)
-
Pipe Sizes: 6 and 10-inch water main; 10-inch force main
-
Pipeline Design
-
Water Infrastructure
-
Stormwater Improvements
-
Pavement Reconstruction
-
Sidewalk Improvements
-
Sewer Force Main Connection
-
Open Cut
-
Horizontal Directional Drilling
-
Jack and Bore
-
Pipe Bursting
-
Public Outreach
-
Permitting
-
Landscape Architecture
-
Topographical Survey
-
Subsurface Utility Engineering