This is a multi-discipline resurfacing, restoration, and rehabilitation (RRR) project consisting of resurfacing 11 miles of SR 85 from north of SR 123 to Hospital Drive,
including travel lanes, auxiliary lanes, median crossovers, and paved shoulders. The existing typical section is a rural four-lane divided highway and an urban four-lane curb and gutter section. Improvements include adding or shifting numerous turn lanes on SR 85 and on the I-10 ramps, extending six turn lanes, adding continuous right-turn lanes northbound and southbound on SR 85 for 0.5 miles, widening a side road, adding sidewalk for one mile, ADA improvements throughout the urban section, constructing four retaining walls including two under the I-10 overpass, adding pedestrian lighting, and adding mast arms to three intersections.