WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Bay Drive and River Drive Bridges

Client:
City of Vero Beach
Market:
Highways, Roadways & Bridges
Location:
Indian River County, FL

Project Details

WGI designed two 40-foot wide by 22-foot long single-span bridges with 20- foot long approach slabs in the City of Vero Beach. Both bridges are located in the Intracoastal Waterway north of the 17th Street Bridge and provide a single point of access between the A1A Highway and more than 40 residences situated on the two islands. The replacement and widening of the existing bridges were completed using phased construction that maintained at least one lane of vehicle traffic across the bridges at all times while also maintaining utility services to the islands during the bridges’ replacement without service interruption.

The bridges were both constructed utilizing prestressed concrete piles, concrete pile caps, and prestressed concrete deck units that were transversely post-tensioned. The bridges feature decorative concrete pilasters and concrete barrier walls with inlaid detailing. The bridges also include concrete utility shelves located outside of the bridge barriers.

WGI staff provided structural design services and construction administration services. Design services included preparation of construction design plans, signed and sealed design calculations, preparation of an engineer’s cost estimate, and oversight of the permit application process. Construction services included observation of the concrete prestressing, reinforcement, and concrete placement. Field and prestressed yard observations were completed throughout construction so that final certification could be provided.

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.