WGI is responsible for the engineering design, subsurface utility engineering,
permitting and bidding services for the replacement of an existing four-inch
water main with a six-inch water main. Also, an existing drainage problem on the
north side of Lewis Cove Road was addressed, as well as installing a inch-inch
reclaimed water main for future use, and preparing a pavement section design for
the rehabilitation/resurfacing of Lewis Cove Road. Subsurface utility designating
services included the location of sanitary sewer laterals along the roadway. The
project also includes a pavement analysis of the existing roadway for the design of
a pavement section which will address the existing deteriorated roadway surface
and subsurface base material.
Project Highlights: