WGI is providing civil engineering services for improvements to Brackenridge Park, supporting the restoration and enhancement of one of San Antonio’s largest and most historic public spaces. As part of this City of San Antonio bond-funded project, WGI is developing solutions to reintroduce water into the park’s historic Acequia, Raceway, and Lily Pond while preserving the character and integrity of these culturally significant features. The project also connects and extends the proposed Spirit Reach Trail from Hildebrand into Brackenridge Park. WGI’s services include site civil design, grading, pump sizing and siting, water supply and hydraulic analyses, stormwater management studies, and permitting support. Through hydraulic modeling, waterloss calculations, evaluation of historic drainage patterns, and grading analyses, WGI is developing sustainable solutions that balance historic preservation, environmental stewardship, and long-term operational performance. The effort includes extensive coordination with the City of San Antonio, SAWS, TCEQ, San Antonio River Authority, Office of Historic Preservation, Texas Historical Commission, and the broader design team. WGI is also coordinating with the River Authority’s Spirit Reach Trail team to create a cohesive connection to the park’s multi-use trails, helping reactivate historic features while improving connectivity, accessibility, and visitor experience.