WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Bristol Myers Squibb Parking Garage

Client:
Bristol Myers Squibb
Market:
Parking
Location:
Plainsboro, NJ

Project Details

Bristol Myers-Squibb three parking structures were built in 1991 and provide parking for 1,114 vehicles. The structures are precast pre-topped concrete double tees and have one supported level and one slab-on-grade.

WGI was retained to conduct a condition assessment of each of the structures exhibiting high levels of deterioration. Repair options included a full depth slab replacement and slab strip repairs, in addition to beam, column, and wall repairs, floor drain replacement, and installation of sealants. WGI created repair documents and is currently in the construction phase of the project for Parking Structure #3; the other structures are now in the bidding phase.

Project at a Glance

  • Bristol Myers Squibb Parking Garage — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.