WGI was responsible for the survey, design, permitting and construction observation services for an extension of a 16” water main and an 8” force main to complete a water distribution loop within Seacoast Utility Authority’s distribution system. The extension included 6,900 linear feet of 16” water main from Hood Road to 117th Court. The project also included the design, permitting and construction observation services for the relocation of 1,400 linear feet of 8” sanitary force main. The utility extension included:
- 6,900 Linear Feet of 16” Water Mains
- Crossing over I-95
- 1 jack and bore crossing Central Boulevard
- 1,400 Linear Feet of 8” Force Main
- 1 jack and bore crossing Central Boulevard