WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

City of Charlotte Restoration of Parking Garages I (3 of 6 Structures)

Client:
City of Charlotte
Market:
Parking
Location:
Charlotte, NC

Project Details

The Seventh Street Station Parking Structure, constructed in 1988, is a cast-in-place post-tensioned concrete slab and beam system of 10 levels where the bottom level contains both commercial and loading dock areas. The garage was performing well; however, some general concrete and waterproofing repairs were needed to avoid larger future maintenance costs. 

The 201 Tryon Street Parking Structure has 10 levels of parking, one of which is on grade at street level. The garage is constructed of precast concrete double tees, columns, and walls and was constructed in 1997. The structure was experiencing some moisture infiltration; general maintenance and minor repairs were recommended. 

The TransAmerica Square Parking Structure has two levels of parking located below grade. The structure was completed in 1997 and is composed of cast-in-place concrete beams and columns. The garage was experiencing significant water infiltration from the plaza areas above. Immediate repair items included the replacement of expansion joints, sealants at construction joints and cracks, and addressing the water infiltration problem. 

Project at a Glance

  • City of Charlotte Restoration of Parking Garages I (3 of 6 Structures) — image 1
  • City of Charlotte Restoration of Parking Garages I (3 of 6 Structures) — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.