Learn from award-winning professionals — explore our whitepapers, blogs, and the latest industry updates.
Join our dynamic organization of engineers, land surveyors, landscape architects, environmental scientists, and architects!
Talk to a market leader today! We’ll answer any questions you have about our professional services.
The Green Street Parking Structure was constructed in 1975 and was divided into three sections by expansion joints. The three-section structure provides street-level parking with 61 spaces and two supported parking levels with 437 spaces. A double-threaded helix was located on the east end of the structure and a partial helix on the west end.Â
WGI completed a comprehensive condition review that included excavations of post-tensioned slabs. It was determined that the center section and the two helix ramps should be demolished; the two outside sections of the structure were restored, and the middle section was replaced with a ramping system. WGI provided structural engineering for the new construction, including foundations and superstructure. WGI’s Restoration Team developed drawings and specifications for the East and West Section restoration. Repairs included: concrete repairs, slab post-tensioning repairs, sealants, deck coatings, installation of bumper guards, and strengthening of precast connections.Â
Sign up to receive emails to hear our latest news and achievements in our monthly newsletter.
Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.
WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.
WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.