WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway

Client:
Florida's Turnpike Enterprise
Market:
Transportation, Highways, Roadways & Bridges, Tolls & Managed Lanes
Location:
Orange and Osceola Counties, FL

Project Details

Another comprehensive and highly involved project requiring a wide range of WGI’s services, responsibilities included roadway design; drainage; signing and pavement marking design and plans production; structures design and plans production for the two 1,700+ foot long Category II third-level steel box girder bridges at the SR 417 interchange; mainline tolling gantry design; environmental permitting; utility coordination; subsurface utility exploration; and survey and mapping services.  

This project involves the widening and/or reconstruction of Florida’s Turnpike (SR 91) from Osceola Parkway to the Beachline Expressway. The specific limits for this project are the northbound and southbound lanes from M.P. 247.770 to M.P. 255.499. Within this proposed 8-lane section of SR 91, the northbound and southbound directions each will consist of two 12-foot express lanes separated from two 12-foot general purpose toll lanes by a 4-foot buffer with express lane markers. Other improvements associated with this project include the construction of three ramps at the SR 91/SR 417 interchange.  

These ramps include Ramp A2 (northbound SR 91 to southbound SR 417) which includes the construction of a 1,882 ft long Category II/third level steel box girder bridge structure, Ramp C2 (southbound SR 91 to northbound SR 417) which includes the construction of a 1,715 ft long Category II/third level steel box girder bridge structure, and Ramp D1 (southbound SR 91 to southbound SR 417). Improvements associated with this project also include the reconstruction and/or widening of the Osceola Parkway and Orlando South Interchange exit/entry ramps, including the replacement of the existing ramp bridge at the Orlando South Interchange.  

Other proposed bridge improvements include the replacement of the SR 91 bridges over the Central Florida Rail Corridor and over Central Florida Parkway/CSX Railroad Spur, and the replacement of the existing Orange County roadway overpasses at CR 527 (Orange Ave) and Taft-Vineland Road. Other improvements include signing and pavement marking related to the implementation of express lanes, drainage and stormwater management improvements, highway lighting within the interchange limits, upgraded ITS infrastructure, and the addition of three tolling facilities.

Project Cost $192,000,000.00

Project at a Glance

  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 1
  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 2
  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 3
  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 4
  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 5
  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 6
  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 7
  • Florida's Turnpike Widening and Express Lanes from Osceola Parkway to Beachline Expressway — image 8

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise