WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Folly Beach Pier

Client:
Charleston County Parks & Recreation Commission
Market:
Marine & Coastal
Location:
Charleston County, South Carolina

Project Details

WGI was contracted by Charleston County, South Carolina, to design a 1,042-foot-long pier. The new pier was designed to replace an existing timber structure that had on-going deterioration issues caused by marine bores. The pier’s design includes an apron for covered seating at the shore; two widened observation areas with shade structures located along the pier, and a large diamond head pier terminus with a decorative shade structure. The pier was designed to emulate the iconic appearance of the existing Folly Beach Pier while providing a more resilient structure.

Design of the new pier was coordinated with Charleston County and Folly Beach Stakeholders to incorporate local event features. The design accounted for minimizing disruptions to beach operations and quick turn-around reopening of leased restaurant and bar space on the pier apron. WGI and the local sub-consultant provided all engineering, permitting, cost estimation, and construction administration for the removal of the existing wooden structure and replacement with a new concrete pier.

The new pier was constructed with precast concrete piles, pile caps, and post-tensioned beams. The walking surface between the beams is constructed with break-away wood deck panels. The break-away wood deck is designed to allow for energy dissipation during severe storms. Vertical picket wood rails and wood benches are located between concrete bollards. Amenities on the pier include multiple shade structures along the length of the pier, wood benches, bait-cutting stations, freshwater hose bibs, electrical outlets for maintenance staff, electrical service at the end of the pier for special events, and sea-turtle-friendly lights.

Project at a Glance

  • Folly Beach Pier — image 1
  • Folly Beach Pier — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise