WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

I-4 at Polk County Line Road Design-Build

Client:
Florida Department of Transportation - District 1
Market:
Transportation, Highways, Roadways & Bridges
Location:
Polk County, Florida

Project Details

WGI was the engineer of record for this project which widened the I-4 eastbound off-ramp to provide for 700-foot dual right turn lanes with tapers and a single left turn lane. The single-lane eastbound on-ramp was maintained. County Line Road was widened to provide 260-foot southbound dual left turn lanes onto South Frontage Road. South Frontage Road was widened to receive the dual lefts and tapered back to a two way roadway. Separate westbound right turn lane and a thru-left turn lane were provided on South Frontage Road. Sidewalk, curb and gutter were replaced as necessary. New traffic signals and pedestrian features were installed on County Line Road at the off-ramp and at South Frontage Road. Signage for the I-4 Interchange was updated per the 2009 MUTCD. The corridor was milled and resurfaced and thermoplastic pavement markings were installed. All work was conducted within FDOT right-of-way.

Project Cost $1,600,000.00

Project at a Glance

  • I-4 at Polk County Line Road Design-Build — image 1
  • I-4 at Polk County Line Road Design-Build — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise