WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

I-75 Southbound Ramp at SR 60 Design-Build

Client:
Florida Department of Transportation - District 7
Market:
Transportation, Highways, Roadways & Bridges
Location:
Hillsborough County, FL

Project Details

WGI was the engineer of record on this low bid design-build project which widened the southbound exit ramp to SR 60 to a two-lane, barrier-separated parallel roadway. The scope of work includes approximately 1 mile of new two-lane ramp construction, two new bridges over the CSX Railroad and Woodberry Road, and bridge deck replacement for the southbound I-75 mainline bridges over the CSX Railroad and Woodberry Road. WGI also provided ITS relocation including MVDS, CCTV pole and DMS panel; signing and pavement marking including replacement OH cantilever guide signs; MSE retaining walls; SWFWMD permit for treatment and attenuation within existing right-of-way; utility coordination; survey; drainage and project management services. WGI performed Quality Level B and A utilities investigations to resolve utility conflicts at the bridge widenings and at proposed drainage structure locations along the ramps.

Project Cost $15,200,000.00

Project at a Glance

  • I-75 Southbound Ramp at SR 60 Design-Build — image 1
  • I-75 Southbound Ramp at SR 60 Design-Build — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.