WGI, in partnership with Ranger, submitted the successful bid for this $80 million Design-Build project for FDOT District 4. Improvements included widening the I-95 Mainline from four to eight lanes from SR 70 to south of SR 614, a distance of 9 miles. The project included reconstruction of the interchanges at SR 70 and SR 68, two bridge replacements and six bridge widenings. This project was one in a series of interstate widening projects that expand the interstate system’s ability to ensure the mobility of people and goods, enhance economic prosperity and preserve the quality of our environment and communities.
WGI, as lead designer, provided roadway design, survey, environmental assessment and permitting, drainage, signing and pavement marking, utility coordination, utility relocation design and traffic control plans.