Project Details
Project at a Glance
Contact Our Team About Your Next Project.
At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.
































WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.
You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.
Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.
Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.
Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.
Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.
Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.
Our passionate design professionals frequently share their expertise at webinars and virtual events.
The City of Columbia Major Pipeline Rehabilitation Project is a multi-year program that includes the assessment, rehabilitation method alternatives analysis, preliminary and final design, and construction services support including documentation preparation and technical specification development of 108,000 linear feet of 15 to 54-inch sanitary sewer infrastructure. The project is part of the City of Columbia Clean Water 2020 program, in response to a Consent Decree with the EPA for sanitary sewer overflows. Inspections and investigation information were evaluated, site access and construction feasibility performed, and rehabilitation method alternative analysis to develop recommendations for the design phase. In the design phase, secondary analysis of method verification, site survey and geotechnical analysis completed in developing plan and contract documents. Technical specifications developed for identified methods including Cured-In-Place-Pipe (CIPP), Geopolymer Lining, Pipe Bursting, and lateral and manhole rehabilitation methods. Lateral rehabilitation guidance decision process developed for application during construction. Easement needs identification and coordination for construction and O&M. Construction document preparation, project phasing, site access identification, and construction cost estimating.
• Total Pipe Length: 108,000 Linear Feet of Sanitary Sewer Design
• Pipe Sizes: 15 to 54-inch
• Pipe Materials: Clay, Concrete, RCP, Hobas, Ductile and Cast Iron
• Pipeline Methods: Pipe Bursting, CIPP, Boring, Geopolymer Lining,
• Manhole Methods: Coating Systems and Polymer Concrete Inserts
• Lateral Methods: CIPP, Pipe Bursting, Open-Cut
• Sewer System Condition Assessment
• Rehabilitation Method Selection and Risk Prioritization Planning
• Rehabilitation Method Specification Development
• Lateral Rehabilitation Method Decision Process
• Constructability Assessment
• Site Access and Coordination
• Flow Bypass Planning
• Waterway Crossing and Wetlands Management
• Stakeholder Coordination
• US Railroad Permit Coordination
• EPA Consent Decree Compliance Program