WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

New Interchange at SR 9/I-95 and St. Johns Heritage Parkway SE Design-Build

Client:
Florida Department of Transportation – D5
Market:
Transportation, Highways, Roadways & Bridges
Location:
Brevard County, Florida

Project Details

WGI was the engineer of record for this new interchange at SR 9/I-95 and St. Johns Heritage Parkway SE in Brevard County. The RFP concept proposed a partial cloverleaf interchange as the preferred configuration. During the Alternate Technical Concepts (ATC) process, our Design-Build Team proposed and was approved for a Diverging Diamond Interchange (DDI). The DDI features a center shared-use path and is the first to be built in Brevard County. The project required the preparation of a Supplemental Interchange Modification Report (IMR) for review and approval by FHWA and FDOT prior to construction. In addition, WGI’s alternate drainage conveyance and stormwater treatment plan was approved by the St. Johns River Water Management District and FDOT D5. This drainage approach significantly reduced impacts to Florida Gas Transmission facilities (two high-pressure gas mains within a 65-foot easement) along the west side limited-access right of way and reduced impacts to I-95. I-95 mainline. Overall design and approvals were completed within a nine-month design schedule for RFC plans, without impacts to the construction schedule. This project received FTBA’s Design-Build Award.

Project Highlights:

  • First Innovative diverging diamond interchange built in Brevard County.
  • Final design eliminated over 450 linear feet of drainage system jack and bore and 1,700 linear feet of deep excavation for stormwater piping along Florida Gas Transmission’s easement to preserve their maintenance access and meet the FGT/FDOT Global Settlement Agreement.

Project Cost $29,500,000.00

Project at a Glance

  • New Interchange at SR 9/I-95 and St. Johns Heritage Parkway SE Design-Build — image 1
  • New Interchange at SR 9/I-95 and St. Johns Heritage Parkway SE Design-Build — image 2
  • New Interchange at SR 9/I-95 and St. Johns Heritage Parkway SE Design-Build — image 3
  • New Interchange at SR 9/I-95 and St. Johns Heritage Parkway SE Design-Build — image 4

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise