WGI was the engineer of record for this design-build project which replaced the existing northbound I-75 rest area at mile marker 238 in Hillsborough County. Improvements include constructing new buildings, parking areas, dog parks, picnic pavilions, roadway and site lighting, and other improvements. The project enhanced safety, security, parking capacity, and traffic flow and accommodates future I-75 widening.
WGI and its build partner, Pepper, implemented an innovative drainage design that accommodates future impervious area. The new rest area is highly functional with improved security due to clear sightlines, better pedestrian safety, enhanced vehicular circulations, increased parking, and several details that optimize ease of maintenance.
This project uses highly durable materials, such as precast panels with integral coloration for a long design life. In addition, all materials and fixtures are vandal-resistant and low-maintenance. The team provided material warranties in addition to those required by FDOT.
PROJECT HIGHLIGHTS
- Efficient Layout- Two restroom wings, one for both Men and Women with a “straight shot” approach. This allows for simplification of design, which allows for featuring convenient access for maintenance through an oversized chase, running the length of each restroom wing.
- Security – Centralized security office giving panoramic views of the entire site.
- Play Area – Open play area with various size berms creates safe and dynamic space for children to play.