WGI provided structural engineering services for the pre-cast seawall with prestressed piles, pre-cast sheet walls, and cast-in-place cap, along with ADA compliant floating docks at the Palm Harbor Marina, located in the heart of the Palm Beaches.
In addition, WGI provided construction phase services for this project, including shop drawing review, RFI responses, and attended preconstruction meetings and periodic milestone meetings. WGI was on site during construction to observe all construction activities, including concrete placement, pile installation, dock installation, and floating dock installation. Being engineer of record and CEI for this project allowed WGI to quickly and efficiently solve any construction-related issues that arose during construction.