WGI was responsible for the preparation of roadway and signing and pavement marking plans required for improvements to Palmetto Park Road between I-95 and St. Andrews Boulevard, a distance of 1.5 miles. Improvements to this divided urban arterial consisted of roadway widening from an existing 6-lane section to an 8-lane section, capacity improvements to the existing storm water management facilities to accommodate additional impervious areas, signalization improvements to two intersections (Military Trail and St. Andrews Boulevard), widening of an existing bridge over South Florida Water Management District’s E-3 Canal, and channel improvements to the E-3 Canal at the bridge widening. Environmental permitting, title ownership research, topographical survey, geotechnical investigation, lighting design analysis report, aerial photogrammetry, utility coordination, and local municipality coordination were all additional services completed as part of the design effort.