WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Peanut Island Floating Dock Replacement

Client:
Palm Beach County Board of County Commissioners
Market:
Parks, Water & Environment, Marine & Coastal
Location:
Palm Beach County, FL

Project Details

The Palm Beach County Capital Improvements Division identified that the floating dock serving as the public water taxi dock had reached the end of its service life and needed to be replaced. WGI was contracted to perform necessary prework investigations, design, and permitting for the replacement project. Specialty Structures evaluated the existing fixed dock for soundness. At the same time, the Environmental Department performed a benthic resource survey to identify seagrasses, corals, and other flora and fauna within the project scope. The team collaborated to incorporate survey findings to design a replacement dock that would minimize impacts to existing resources while upgrading the dock for enhanced resiliency and features to meet the Americans with Disabilities Act (ADA) requirements. The permitting strategy was to qualify the proposed work for an exemption under State of Florida rules and meet the Standard Programmatic General Permit (SPGP) requirements for federal authorization. Due to a thorough application package, the permitting review lasted only two months, and the exemption and SPGP authorization were received.

Project Highlights:

  • In-house coordination between two departments to create a successful project that met the client’s demands and while avoiding natural resources to allow for an efficient wetlands permitting approval.
  • Designed an alternative ADA-compliant ramp to connect the floating dock to the fixed dock, while staying within the criteria required for an exemption and SPGP authorization.

Project at a Glance

  • Peanut Island Floating Dock Replacement — image 1
  • Peanut Island Floating Dock Replacement — image 2
  • Peanut Island Floating Dock Replacement — image 3

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.