WGI provided design and construction phase services for a 26-foot wide by 247-foot long pier to dock the following ships: Acoustic Pioneer NAWC 03, NAWC 38, USNS Hugo 8201, USNS Hunter 8202 located at Naval Air Station Key West. The existing steel pier was removed after hurricane damage and was replaced with a concrete pier. The pier was designed using concrete-encased steel pile foundations with epoxy coated reinforced concrete pile caps and prestressed and post-tensioned concrete deck units. The pier is equipped with composite walers and fenders and 30-inch mooring cleats.