WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Riverbend Park Vehicular Entrance Bridge

Client:
Palm Beach County Facilities Development & Operations
Market:
Transportation, Highways, Roadways & Bridges
Location:
Jupiter, FL

Project Details

Palm Beach County developed Riverbend Park as a wildlife management area to provide hiking/biking, canoeing/kayaking, and equestrian trails along the Wild and Scenic Loxahatchee River. The park is located between Indiantown Road and the Hungryland Slough Canal in Jupiter, Florida. As a part of the park’s development, the County wanted to create public vehicle access to Picnic Island in the center of the park.

WGI designed the 75-foot long by 40-foot wide vehicular entrance bridge. The bridge was constructed utilizing prestressed concrete piles with a concrete pile cap and prestressed concrete bridge decks. A decorative stone façade with rounded river stones was used to match the aesthetic appearance of the rustic park. The stone façade was installed on precast concrete panels to also provide the appearance of an arched stone bridge. Timber pedestrian rails were used above the concrete barrier walls to match the park’s aesthetics.

WGI staff provided structural design services and construction administration services. Design services included preparation of construction design plans, signed and sealed design calculations, preparation of an engineer’s cost estimate, and oversight of the permit application process. Construction services included observation of the concrete prestressing, pile driving, sheet pile installation, reinforcement and concrete placement for the end and intermediate bent pile caps, placement and post-tensioning of the bridge deck units, and installing the decorative stone facade. Field and prestressed yard observations were completed throughout construction so that final certification could be provided.

Project at a Glance

  • Riverbend Park Vehicular Entrance Bridge — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.