WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

SR 109 (University Boulevard) / SR 10 (Atlantic Blvd) Intersection Safety Improvements

Client:
Florida Department of Transportation - District 2
Market:
Transportation, Highways, Roadways & Bridges
Location:
Duval County, FL

Project Details

WGI was awarded this contract, which was one of three separate safety projects. The proposed safety improvements to SR 109/SR 10 intersection include extending the southbound right turn lane, adding a northbound right turn lane, and realigning Lawrence Place. The improvements to SR 10 included extending the inside eastbound left turn lane and adding a second (dual) westbound left turn lane. Right-of-way acquisition needed for the improvements required the Team to provide right-of-way control and right-of-way maps. WGI coordinated with the District’s Right-of-Way Acquisition staff to minimize right-of-way impacts, where possible, to the several businesses adjacent to the project.

WGI addressed several additional concerns that developed during the design phase, such as adjustment of SR 109 lane widths to accommodate a newly constructed Dollar Tree Store, evaluated bike keyhole lanes based on new PPM and FHWA criteria and evaluated the use of License Agreements versus traditional TCEs.

Project Cost $418,400.00

Project at a Glance

  • SR 109 (University Boulevard) / SR 10 (Atlantic Blvd) Intersection Safety Improvements — image 1
  • SR 109 (University Boulevard) / SR 10 (Atlantic Blvd) Intersection Safety Improvements — image 2
  • SR 109 (University Boulevard) / SR 10 (Atlantic Blvd) Intersection Safety Improvements — image 3

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.