This project involved the preparation of separate sets of plans and specifications for two improvements. The first improvement included the extension of sound barrier walls (about 1,400 feet) on both sides of the Spur of Florida’s Turnpike (SR91) just north of the Golden Glades toll plaza. The second improvement included repainting of the entire structural steel superstructure of the Turnpike bridge (#870906) over Miami Gardens Drive near Milepost 0.55. In addition, a Class V finish was applied to the exposed concrete surfaces of the bridge, retaining walls, barrier walls, and concrete slope pavement in accordance with a color scheme previously approved by the City of Miami Gardens.