WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

St. Johns River to Sea Loop Trail - S. Palmetto Avenue

Client:
FDOT District Five
Market:
Transportation
Location:
South Daytona, FL

Project Details

This project was Segment 5 of the St. Johns River to Sea (SJR2C) Loop Project Development & Environment Study (PD&E), a 1.2-mile link between Ridge Road and Beville Road located in South Daytona, Volusia County.

WGI’s east side alignment design minimized impacts to adjacent landowners, eliminated a potentially dangerous mid-block crossing, and utility crossings. SUN Trail funding and design criteria were requirements on this project and prohibited R/W acquisition by eminent domain for this trail project. The design incorporated the Florida Design Manual (FDM) standards, including pedestrian, bicycle, and shared-use path design criteria. In areas where R/W was restricted and the acquisition was not available, WGI proposed to modify the typical section using FDM shared use path criteria. South Palmetto Avenue is a residential collector road situated in R/W owned by the City of South Daytona and posted for 25-mph. Variations of the FDM criteria were approved to utilize a 2-foot trail separation offset from the travel lane edge to the trail edge, an 8 to 10-foot trail width, and a 2-foot outside buffer, eliminating costly R/W and a lengthy R/W acquisition process. Varying widths of the trail and buffer to eliminate costly R/W costs and a lengthy acquisition process were incorporated into the design.

Project Highlights:

• SUN Trail funding, 3D Design Modeling, local agency coordination, elimination of expensive and lengthy R/W acquisitions, accelerated schedule, traffic count studies, lighting analysis, drainage retrofits, AutoTurn analysis, ADA compliance reviews with FDOT, and maintained R/W

Project Cost $2,473,000.00

Project at a Glance

  • St. Johns River to Sea Loop Trail - S. Palmetto Avenue — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.