WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

State Road 7 Widening Design-Build Fillmore Street to Sterling Road

Client:
Florida Department of Transportation - District 4
Market:
Transportation, Highways, Roadways & Bridges
Location:
Hollywood, Florida

Project Details

WGI was the engineer of record for this $32 million Design-Build project for the Florida Department of Transportation District Four. This project increased capacity and improved safety by widening a 2.1-mile section of SR 7, converting it from a five-lane section with center turn lane to a six-lane divided urban arterial section. Other improvements include installation of a new stormwater management and collection system; sanitary sewer (gravity and force mains); two 12” water mains; lateral connections; and all other associated features, such as valves, meters, etc. Right-of-way acquisition for over 40 parcels was required. A Utility Work by Highway Contractor Agreement (UWHCA) between the City of Hollywood and the FDOT paid for the water and sewer improvements.

This was the first Design-Build project in District 4 where the FDOT handed the responsibility for assessment and remediation to the Design-Build contractor/ engineer. WGI’s Contaminated Area Management Plan addressed soil and groundwater that was contaminated by arsenic and petroleum hydrocarbons. Sections of the project corridor had been previously labeled as contaminated, but WGI found uncertainties with some of the previous data and retested areas within the limits of construction. Based on their results, WGI found numerous areas of the project did not require remediation which shortened the overall project schedule and reduced costs significantly.

Permits were secured from Broward County Health Department, Broward County, City of Hollywood, Broward County Environmental Program and Growth Management, South Florida Water Management District (SFWMD), and the Florida Department of Environmental Protection (FDEP).

Project Cost $32,000,000.00

Project at a Glance

  • State Road 7 Widening Design-Build Fillmore Street to Sterling Road — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise