WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Sunlake Boulevard from Ridge Road to SR 52 Roadway Development

Client:
Len-Angeline, LLC
Market:
Transportation, Highways, Roadways & Bridges
Location:
Pasco County, Florida

Project Details

Angeline master-planned community is located in Pasco County, south of SR 52 and east of the Suncoast Parkway. Sunlake Boulevard is the main road through the Angeline development from north to south. The project is in a CDD and is part of the Connected City program. This project included design and permitting for approximately four miles of the road from SR 52 to the future Collector Road south of the future Ridge Road alignment. The roadway section is a four-lane divided urban curb and gutter (expandable to six lanes), with five-foot bike lanes, six-foot sidewalk (along one side), 12-foot multi-use path (along the opposite side), and five-foot communications easement adjacent to the multi-use path. The roadway design also included the design of several roundabout intersections and the widening of SR 52 to accommodate the required turn-lane improvements.

The proposed Sunlake Boulevard/SR 52 intersection required a signal warrant analysis and a signal design. The drainage system consisted of curb inlets conveying the stormwater through pipes or swales to stormwater management facilities adjacent to the roadway and/or co-mingled with the adjacent development phase. Bridge structures were placed where the alignment crossed designated wetlands to minimize impacts. Water, reclaimed water, and wastewater trunk lines were provided in the Sunlake Boulevard right-of-way to provide services throughout the community.  

Phase 2A of the development includes 590 single-family units and associated amenities on approximately 430 acres. Water reclaimed water and wastewater main lines in the Sunlake Boulevard right-of-way provide services for the overall development and access to Phase 2A from Sunlake Boulevard.  

Project Highlights:

  • Roundabout design, shared-use path, bike lanes, water trunk lines, accelerated design schedule.

Project Cost $29,900,000.00

Project at a Glance

  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 1
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 2
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 3
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 4
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 5
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 6
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 7
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 8
  • Sunlake Boulevard from Ridge Road to SR 52 Roadway Development — image 9

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise