WGI provided design and construction phase services for Sunrise Pump Station No. 2, a stormwater pump station with a standby generator building. The project consists of a concrete wet-well with submersible pumps and an emergency CMU generator building with a hollow-core ceiling and a standing seam metal roof. The wet-well has an aluminum trash rack with an automatic trash removal arm, and the canal banks have been protected with interlocking revetment mats. The limited construction space makes this project unique since all required equipment had to be configured to optimize the small site.
Project Cost
$3,000,000.00