WGI was responsible for the design, surveying and permitting of an 8-inch watermain upgrade for a 2-block section in the City, as well as removal of an existing watermain. In addition to a new 8-inch watermain, the design included coordinating existing sanitary and water service locations and their proposed tie-in location in an effort to minimize the replacement of existing services, service inactivity, swale reconstruction and pavement rehabilitation. WGI also provided a boundary, location and topographic survey, as well as subsurface utility engineering services for locating and designation of underground utilities to ensure conflict avoidance.