WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

The Beach Club

Client:
The Beach Club
Market:
Water & Environment, Marine & Coastal
Location:
Palm Beach County, FL

Project Details

WGI was retained to provide consultation for replacement or repairs of the seawall for this club on the Atlantic Ocean. The existing walls and repairs date back to the 1920s. Years of weather and hurricane damage had damaged the wall to the point where repairs were not the best solution, and a replacement was required. Due to the extensive tie-back system, pool located adjacent to the wall, and the foundation for the two-story club building within ten feet of the existing wall, placing the new wall upland of the existing wall was not an option due to the existing foundations and pool structure. Conventional seawall construction was also not an option. Instead, our team designed a new cantilevered wall, which was placed within eighteen inches of the east face of the existing wall utilizing press-in technology. The “Giken” machine was developed to pre-auger holes and press-in sheet piles while advancing along the newly constructed wall. The wall was constructed without vibration or damage to the existing building or pool. In addition to the unique design, a new concrete cap to support a glass railing and a concrete facing on the exposed portions of the seaward side was provided for added corrosion protection. The 360-foot long wall was constructed on time and within budget.

Project at a Glance

  • The Beach Club — image 1
  • The Beach Club — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.