Project Details
Contact Our Team About Your Next Project.
At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.
































WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.
You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.
Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.
Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.
Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.
Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.
Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.
Our passionate design professionals frequently share their expertise at webinars and virtual events.
The Town of Greenwich Town Hall parking structure is constructed of cast-in-place concrete and contains one level of on-grade parking and 1-1/2 supported levels. The parking structure has been in service since 1984 and contains approximately 280 parking spaces.
WGI completed a condition appraisal to assess its general condition and provide the owner with recommendations for initial repairs, anticipated future repairs, and maintenance necessary to maintain the facility’s integrity. The report outlined a number of issues impacting the durability of the parking structure, noting the following items of concern: open concrete spalls; loose overhead concrete; exposed post-tensioning tendons; loose grout pockets (stressing pockets); deteriorating brick walls surrounding the stairs; failed expansion joint and isolation joint seals around the perimeter of the upper level; the lack of waterproofing membrane; and other miscellaneous items. A preventative maintenance plan was recommended to include the repair of damaged mortar joints, the addition of a restriction bar at the entrance, and the application of a penetrating surface (waterproofing) sealer. WGI developed construction documents in 2006 for construction in 2007/2008.