WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

VA Medical Center Garage A

Client:
Apogee Consulting Group
Market:
Healthcare
Location:
Durham, NC

Project Details

WGI and Apogee collaborated on structural repairs for the VA Medical Center Garage A, located in Durham, North Carolina. The work scope included an engineering assessment of the overall garage, structural analysis, preparation of construction documents, and construction administration. 

During the engineering assessment, several of the post-tensioned cables (main slab reinforcing) on the garage’s top level were either damaged or broken due to the low concrete cover provided during the original construction of the garage. 

The repair approach consisted of exposing and repairing all the damaged or broken post-tensioned cables. In addition, a one-inch removal of the existing structural slab was completed on the top level of the deck at areas with low concrete cover. A micro-silica overlay was installed in the areas where the 1-inch removal occurred. The overall thickness of the overlay varies between one and three inches. The one-inch concrete removal limits the additional dead load from the new overlay and increases the new overlay’s bond strength. The new micro-silica overlay will address the low concrete cover and increase the garage’s long-term durability. 

Project Highlights 

  • Engineering assessment
  • Garage repair of broken post-tensioned cables and concrete overlay 
  • Maintain garage occupancy 

Project at a Glance

  • VA Medical Center Garage A — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.